DRAFT---DRAFT---DRAFT---12/15/95
FOREST HEALTH PILOT
1996 Proposed Projects
Tahoe, Plumas and Lassen National Forests
Fire Hazard Reduction
TAHOE NATIONAL FOREST
Type of Project | Project Name | Estimated Cost | Projected Acres Treated | Cost Per Acre | Est. Volume Output (mbf) | Analysis Acres |
Thin & Remove | Davies | $250,000 | 1,000 | $250 | 1,000 | |
Treasure | $100,000 | 200 | $521 | 400 | ||
Highway 89 | $50,000 | 200 | $250 | 300 | ||
Fuelbreak Construction | Highway 89 | $85,000 | 170 | $500 | 170 | |
Fuelbreak Underburn | Calpine | $12,000 | 75 | $160 | ||
** NEPA Prep & timber Sale Prep | Liberty | $50,000 | $7.14 | 7,000 | ||
Indirect Costs 14% | $89,000 | $54.10 | ||||
TOTAL | $636,000 | 1,645 | $387 | 1,870 | 7,000 |
PLUMAS NATIONAL FOREST
Type of Project | Project Name | Estimated Cost | Projected Acres Treated | Cost Per Acre | Est. Volume Output (mbf) | Analysis Acres |
Thin & Remove | Willow Creek I Community Interface |
$228,000 | 900 | $253 | 2,500 | |
" | Hungry | $343,000 | 1,290 | $266 | 500 | |
Fuelbreak Construction | Pinebelt | $228,000 | 900 | $253 | 2,000 | |
" | Keddie Ridge | $33,000 | 60 | $550 | ||
" | Hungry | $229,000 | 900 | $254 | 500 | |
Underburn | Forbestown Community Interface | $17,500 | 50 | $350 | ||
Brush Creek Community Interface | $17,500 | 50 | $350 | |||
** NEPA Prep for future thin & remove, fuelbreak construct | Willow Creek II Community Interface | $100,000 | $33 | 3,000 | ||
Indirect Costs | $195,000 | |||||
TOTAL | $1,391,000 | 4,150 | $335 | 5,500 | 3,000 |
LASSEN NATIONAL FOREST
Type of Project | Project Name | Estimated Cost | Projected Acres Treated | Cost per Acre | Est. Volume Output (mbf) | Analysis Acres |
Thin & Remove | Antelope A-1 Biomass | $200,000 | 1,000 | $200 | ||
Fuelbreak Brush Pile | Chutes Fuelbreak | $395,975 | 1,175 | $337 | ||
" | Berner Fuelbreak Expansion | $40,000 | 250 | $160 | ||
" | Kelley Fuelbreak Expansion | $40,000 | 250 | $160 | ||
" | Little Valley Community Interface | $67,400 | 200 | $337 | ||
Fuelbreak Hand Thin and/or Pile | Community Interface & Fuelbreak (Eagle Nest) | $90,000 | 300 | $300 | ||
" | Maintenance Mill Cr, Silver Lk, Willow Cr, & Feather River Homesite (hand pile & burn) | $20,400 | 100 | $204 | ||
Fuelbreak Biomass/Tractor Piling | A-21 Corridor | $108,500 | 500 | $211 | ||
89 Corridor | $108,500 | 500 | $211 | |||
Butte Cr Coridor | $108,500 | 500 | $216 | |||
Colby Corridor | $10,850 | 50 | $217 | |||
Fuel Reduction | Feather River Tractor Pile | $80,000 | 500 | $160 | ||
" | Almanor/Prattville Tractor Pile | $49,700 | 300 | $166 | ||
Underburn | Westwood Junction (prior biomass) | $60,000 | 1000 | $60 | ||
Indirect Costs | 14% | $193,175 | ||||
TOTAL | $1,573,000 | 6,625 | $238 |
SUMMARY OF COSTS FOR FIRE HAZARD REDUCTION
Forest | Estimated Cost | Projected Acres Treated | Cost per Acre | Estimated Volume Output (mbf) | Analysis Acres |
Tahoe | $636,000 | 1,645 | $387 | 1,700 | 7,000 |
Plumas | $1,391,000 | 4,150 | $335 | 5,500 | 3,000 |
Lassen | $1,573,000 | 6,625 | $237 | ||
TOTAL | 3,600,000 | 12,420 | $290 |
Watershed Restoration
TAHOE NATIONAL FOREST
Type and/or Project Name | Estimated Cost | Projected Acres Treated |
Shrub Plantings | $15,000 | 150 |
Road Closures | $4,000 | 8 (4 gates) |
Streambank Stabilization | $36,000 | (12 miles) |
Stream Structures (Cottonwood Fire) | $20,000 | 500 (20 structures) |
Contour Felling (Cottonwood Fire) | $27,000 | 270 |
Indirect Costs | $18,000 | |
TOTAL | $120,000 | 928 |
PLUMAS NATIONAL FOREST
Type and/or Project Name | Estimated Cost | Projected Acres Treated |
Bagley Meadows | 6,000 | 10 |
Little Stoney Creek | 3,000 | 5 |
Thompson Valley | $9,000 | 5 |
Downing/Summit Allotment | $30,000 | 10 |
Ross Meadow | $12,000 | 5 |
Newton Flat Pond | $16,000 | 3 |
Boulder Creek Meadow | $6,000 | 2 |
Hallet Meadow | $5,000 | 5 |
Boulder Creek at Hallett Meadow | $10,000 | 2 |
Wickman Meadow | $5,000 | 5 |
Wheeler Sheep Camp | $5,000 | 2 |
Pierce Creek | $5,000 | 2 |
Indian Creek Rock Source | $5,000 | (1 plan) |
Black Rock Creek | $44,000 | 20 |
Grizzly Creek | $40,000 | 8 |
Fingerboard Pit Revegetation | $10,000 | 5 |
** Indian Roak Source Plan | $5,000 | |
** Upper Dutch/Secret Diggin Plan | $15,000 | |
** Grizzly Cree/Willow Creek Divide Watershed/Wetlands Restoration Plan |
$8,000 | |
Indirect Costs (14%) | $39,000 | |
TOTAL | $278,000 | 89 |
LASSEN NATIONAL FOREST
Type and/or Project Name | Estimated Cost | Projected Acres Treated |
Quarry Gulch erosion structures, road closures, meadow restoration | $51,000 | |
Crazy Harry Gulch erosion structures, meadow restoation, change road crossing | $27,000 | |
Pine Creek watershed restoration, return flows to natural channel | $35,000 | |
Little Merrill Creek erosion control/fish barrier structure | $20,000 | |
Westwood Junction Section of the Susan River erosion control and riparian vegetation | $31,500 | |
Susan River road closure and obiteration | $4,000 | |
Indirect costs (14%) | $23,500 | |
TOTAL | $192,000 |
SUMMARY OF COSTS FOR WATERSHED RESTORATION
Forest | Estimated Cost | Projected Acres Treated |
Tahoe | $130,000 | 928 |
Plumas | $278,000 | 89 |
Lassen | $192,000 | |
TOTAL | $600,000 | 1,017 |
Monitoring
Forest | Type and/or Project | Estimated Cost |
Tahoe | Project Monitoring | $17,200 |
" | Indirect Costs (14%) | $2,800 |
Plumas | Project Monitoring | $34,400 |
" | 3- Forest Monitoring for Technical Fuels Report | $86,000 |
" | Indirect Costs (14%) | $19,600 |
Lassen | Project Monitoring | $35,000 |
" | Indirect Costs (14%) | $4,900 |
TOTAL | $200,000 |
Land Management Planning
Forest | Type and/or Project | Estimated Cost |
Plumas/Lassen | Plumas LMP Midpoint Review and Plumas and LMP Assessment (include TFR concepts) | $258,000 |
Indirect Costs (14%) | $42,000 | |
TOTAL | $300,000 |