TREASURE DFPZ (FUELBREAK CONSTRUCTION)
Sierraville Ranger District, Tahoe N.F.


 

 

Date ESTIMATED
Projected Acres
ESTIMATED
Volume
Output (mbf)
Sawlogs/Biomass Ratio Receipts Cost Cost/acre Status
2/27/96 200 600          
3/11/96 200 600 100/0   $15,000 $75 NEPA- 5/96
Advertise - 9/96
               

 

 

 

January ,(, /),( 0(:,(:,( AM