CORRIDOR DFPZ (FUELBREAK CONSTRUCTION)
Sierraville Ranger District, Tahoe N.F.


The Corridor project is a forest health/fuels reduction thinning project under a service contract. Forest Service preparation included reconnaisance, layout and contract preparation. The contract was let for $342.54 per acre. The contract cost was $459,350. the contract is currently in progress. The volume amounted to 14mbf (75% biomass and 25% sawlog). Source: Letter from Sam Wilbanks to QLG, January, 6, 1998.


Date ESTIMATED
Projected Acres
ESTIMATED
Volume
Output (mbf)
Sawlogs/Biomass Ratio Receipts Cost Cost/acre Status
2/27/96 1,400 300          
3/11/96 1,400 300 0/100       NEPA- 5/96
Advertise - 9/96
01/06/98* 1,341 14 15/85       Awarded, service contract
01/06/98** 1,341 14 25/75   $462,800 $345.16  

* Status report by D. Stone
** Letter from S. Wilbanks to QLG